Construction of Retaining wall for flood Control from kota Barrage to Nayapura Bridge in Kota City.
Client
UIT, Kota
Cost Of Work
308.00 Crore
Year Of Completion
Work in Progress
The work involves design and construction of RCC flood control retaining wall along with backfilling and Gabion works approx 2.5 KM in both side of Chambal river.
The work involves design and construction of RCC flood control retaining wall along with backfilling and Gabion works approx 2.5 KM in both side of Chambal river.