Kota Barrage

Construction of Retaining wall for flood Control from kota Barrage to Nayapura Bridge in Kota City.

Client

UIT, Kota

Cost Of Work

308.00 Crore

Year Of Completion

Work in Progress

The work involves design and construction of RCC flood control retaining wall along with backfilling and Gabion works approx 2.5 KM in both side of Chambal river.

The work involves design and construction of RCC flood control retaining wall along with backfilling and Gabion works approx 2.5 KM in both side of Chambal river.