Construction of Bridge across Tapi River and along Varachha Creek near Varachha Main Road, Surat.

Construction of Bridge across Tapi River and along Varachha Creek near Varachha Main Road and near Varachha water works (4 Lane) at Surat.

Client

Surat Municipal Corporation.

Cost Of Work

189.46 Crore

Year Of Completion

15/10/2023

Foundation :

Total No of foundation - 81 No (Total No of Pile = 496 No) -170 No pile are of 1500 mm dia. And 326 No are of 1200 mm dia.

Substructure : RCC Pier

Superstructure :

Main Span - 4 No x 22.5 m (Solid Slab) +10 No. x 45 m +1 No x 35 m +11 No x 25 m + 1 No x 23.30 m + 1 No x 57.4 m (Bow string Girder) + 1 No x 15.2 m + 2 No x 25 m + 1 No x 33.30 m +14 No x 25 m + 2 No x 9 m.
Main Span Left Side - 4 No x 22.5 (Solid Slab) + 10 No x 45 m + 1 No x 34.77 m + 11 No x 25 m + 1 No x 20.22 m + 1 No x 57.4 (Bow String Girder) + 1 No x 15.2 m + 1 No x 25 m +2 No x 25 m + 2 No x 9 m
Approach Span Right Side-(a) 1 no x 25 m + 1 No x 17 m + 1 No x 6.55 m (b) 5 No x 14 m
Approach Span Right Side- (a) 2 No x 17 m + 1No x 10.43 m (b) 2 No x 17 m
The rest of the span except otherwise specified are the superstructure rest on Precast Prestressed Girder

Approaches : 130 M (Approx)

Length of bridge : 1047 M