PILE FOUNDATIONS
Name of Work : Construction of Retaining wall on both sides abutment of low level makai bridge across River Tapi.
 
Client : The C. E. (S.M.C.) SURAT
 
Cost of Work : Rs. 6.7 Millions
 
Year of Completion : April 1996
 
Description of Work : Construction of Retaining wall on both sides abutment of low level Makai Bridge across River Tapi is having Bored Cast-in-Situ piles of 800 mm diameter (Total 70 nos 15 meters deep) with R.C.C. pile cap & 6 meters high R.C.C. Retaining wall.
 
 
Construction of Retaining wall on both sides abutment of low level makai bridge across River Tapi.
 
 
Remarks :
  • Work completed within Time Limit.