INTAKE STRUCTURES
Name of Work : Construction of drinking water Head work at Dharoi for Hadol regional water supply scheme.
 
Client : The S. E. Gujarat Water supply & Sewerage Board, Palanpur
 
Cost of Work : Rs. 42.03 Millions
 
Year of Completion : July 1998
 
Description of Work : Design & Construction of Intake structure (60 MLD) having bored cast-in-situ piles, pump house, 100 meters long connecting bridge, security cabin, Internal service roads and area grading.
 
 
Construction of drinking water Head work at Dharoi for Hadol regional water supply scheme.
P-3 ( Pier ) with Pile foundation
Construction of drinking water Head work at Dharoi for Hadol regional water supply scheme.
Launching of two span done
Construction of drinking water Head work at Dharoi for Hadol regional water supply scheme.
Dharoi Intake Structure
 
Construction of drinking water Head work at Dharoi for Hadol regional water supply scheme.
 
Construction of Pile Foundation with spud pontoon (100 MT cap.) & floating bridge for Intake structure at Dharoi
 
Construction of drinking water Head work at Dharoi for Hadol regional water supply scheme.
 
Intake Structure with connecting Steel Bridge
( 100 meters long )
 
Construction of drinking water Head work at Dharoi for Hadol regional water supply scheme.
 
Security Cabin for Intake Structure at Dharoi
 
   
Remarks :
  • The work was completed in Time Limit. Piling work was carried out with the help of in house made spud pontoon. Boring was carried out @ 5 meters in Hard Rock.