BRIDGES & FLYOVERS
Name of Work : Providing Bridge No. 33, 34, 35 between Stations Bhilupur and Thuwavi in connection with Gauge Conversion work of Pratapnagar – Chota Udepur.
 
Client : Western Railway, Pratapnagar, Vadodara.
 
Cost of Work : Rs.53.3 Million.
 
Year of Completion : August 2007.
 
Description of Work :

Railway Bridge No.: 33
Pile Foundation 1200 x 44 nos.
Substructure : RCC Pier, Pier Cap
Superstructure : 10.32 m x 6 nos. (PSC Slab)

Railway Bridge No.: 34
Pile Foundation 1200 x 36 nos.
Substructure : RCC Pier, Pier Cap
Superstructure : 14.110 m x 3 Nos. (PSC I Girder.)

Railway Bridge No.: 35
Open Foundation
Substructure : RCC Wall
Superstructure : 7.10 m x 1 No. (RCC Box )

Total Earthwork and blanketing material involved 129000 Cum.

 
Providing Bridge No. 33, 34, 35 between Stations Bhilupur and Thuwavi in connection with Gauge Conversion work of Pratapnagar – Chota Udepur. Providing Bridge No. 33, 34, 35 between Stations Bhilupur and Thuwavi in connection with Gauge Conversion work of Pratapnagar – Chota Udepur.
 
Conventional Routine Load Test on pile
Dismantling of existing old bridge
 
Providing Bridge No. 33, 34, 35 between Stations Bhilupur and Thuwavi in connection with Gauge Conversion work of Pratapnagar – Chota Udepur. Providing Bridge No. 33, 34, 35 between Stations Bhilupur and Thuwavi in connection with Gauge Conversion work of Pratapnagar – Chota Udepur.
 
Pile Cap and Pier Reinforcement Cage
View of Substructure