BRIDGES & FLYOVERS
Name of Work : Construction of low level Submersible Bridge on River Tapti SURAT
 
Client : City Engineer (SMC) SURAT
 
Cost of Work : Rs. 135 Millions
 
Year of Completion : May 1996
 
Description of Work :

Construction of low level bridge across river Tapti near Makai Bridge is 625 meters long having total 25 spans, including Bored Cast-in-Situ Piles of 1500mm diameter(Total 166 no. 33.5 meters deep) as foundations, R.C.C. pier and Pier cap as Sub-structure and PSC slab as Super-structure.

 
 
Construction of low level Submersible Bridge on River Tapti SURAT
Construction of low level Submersible Bridge on River Tapti SURAT
 
Low Level Submerssible Bridge (625 meters Long) on river Tapti for Surat Municipal Corporation, SURAT

Temporary Road and Piling Platform
 
Construction of low level Submersible Bridge on River Tapti SURAT
Construction of low level Submersible Bridge on River Tapti SURAT
 
Specially made trusses (Capable of taking 700 MT load) for PSC Solid slab
Night view of "Swami Vivekanand" Bridge.
 
Construction of low level Submersible Bridge on River Tapti SURAT
Construction of low level Submersible Bridge on River Tapti SURAT
 
625 Meters long bridge (1500 mm Dia Pile, 33.5 Meters Deep)
Temporary Platform for Pile Foundation
 
 
Remarks : The highlights of this project were :
  • Width of the bridge is 20 meters.

  • Maximum depth of water is 11 meters (Tidal condition up to 4.1 meters)