BRIDGES & FLYOVERS
Name of Work : Design & Construction of Road Over Bridge in lieu of L.C. at Km.11/13-14 between Chalthan, Gangadhra near Surat.
 
Client : Ashvika Construction Pvt. Ltd., Vadodara
 
Cost of Work : Rs. 15 Millions
 
Year of Completion : January 1998
 
Description of Work :

Design and construction of 51.32 meters long four lane skew R.O.B. having total 3 spans, having Bored cast-in-situ piles of 1000 mm diameter (Total 32 nos., depth 12 to 15 meters) R.C.C. circular column as sub-structure and 2 × 11.4 meters long R.C.C. Girder and 1 × 19.7 meters long PSC Girder with R.C.C. slab as super structure.

 
 
Design & Construction of Road Over Bridge in lieu of L.C. at Km.11/13-14 between Chalthan, Gangadhra near Surat.
 
 
Remarks :
  • Above project has been carried out before Time Limit. This is First BOT Project in Gujarat State.