BRIDGES & FLYOVERS
Name of Work : Construction of bridge across river Pravara on Ahmednagar Aurangabad section.
 
Client : Keti Sangam Infrastructure (I) Ltd., Bhopal
 
Cost of Work : Rs.33.3 Million (Excl. cost of material)
 
Year of Completion : March 2009
Description of Work :

The two lane river bridge (total length 254 m and width 8.5 m) is consisting of

Foundation :

1300 mm dia pile

Substructure :

RCC Pile Cap

Superstructure :

7 x 36.333 m Precast PSC T Beam / PSC slab.

 
 
View of completed bridge  
 
View of completed bridge
 
 
Remarks :
  • Bored cast in situ piles were cast using spud pontoon in a gorge portion and other than gorge portion Hydraulic Piling Rig HR180 was used.

  • Work completed ahead of schedule.