BRIDGES & FLYOVERS
Name of Work : Design & Construction of Mandsaur Bye pass Bridges at 4/4, 6/4, & 7/6 Km
 
Client : Prakash Asphaltings & Toll Highways (I) Ltd, Indore (M.P.)
 
Cost of Work : Rs. 13.1 Millions
 
Year of Completion : June 1998
 
Description of Work :

The work consists of 3 nos bridges :

  1. Bridge @ 4/4 km 4 spans of 9.525 meters slab of 5 mt with RCC pier / pier cap & open foundation R.C.C. solid slab, Total length @ 50 Rmt

  2. Bridge @ 6/4 km 4 spans of 27 meter length with R.C.C. solid slab, R.C.C. pier & pier cap & pile foundations, Total length of bridge 126 Rmt.

  3. Bridge @ 9/6 km with S.S. of 3 spans of 21.84 m approach slab, R.C.C. pier & pile foundation & pile cap pile Total length 84 Rmt.
 
 
Design & Construction of Mandsaur Bye pass Bridges at 4/4 Km 6/4, Km & 7/6 Km
Design & Construction of Mandsaur Bye pass Bridges at 4/4 Km 6/4, Km & 7/6 Km
 
Bridge across Bugalia Nala
Bridge across Sarwan Nala
 
Design & Construction of Mandsaur Bye pass Bridges at 4/4 Km 6/4, Km & 7/6 Km
 
Bridge across Shivna River
 
 
Remarks :
  • Above project was completed in all respect within tight time period of 6 months.