Name of Work
: |
Construction of 487.5 meter
long Bridge across the creek between Ghoghala
village and Diu Town. |
|
Client : |
The Exe. Engineer, P. W. D., Works Division,
DIU. |
|
Cost of Work : |
Rs. 35 Millions |
|
Year of Completion : |
April 1990 |
|
|
Description of Work : |
Construction of 495 meter long, 15 span
Bridge across creek between Ghoghala and
Diu having Bored Cast-in-Situ Pile of 1000
mm diameter, ( 28 meter depth, Total 72
no.) R.C.C. pier and pier cap as Sub-structure
and PSC girders of 33 meter long with R.C.C.
slab as Super-Structure.
|
|
|
|
|
|
|
Construction
of 495 meters long Bridge across the creek
between Ghoghala and Diu Town.
|
|
|
|
|
15
spans of 33 meters long PSC girders for
Bridge at Diu.
|
|
|
|
|
Remarks
: |
- The main highlights of this outstanding
project was to carry out foundation of Bored
Cast-in-Situ Pile ( Into the lime stone upto
8m) under 7 to 8 meter deep water level, having
very high velocity of flow.
|
|