Name of Work
: |
Construction of 2 - two lane Flyover bridge on 60 m wide Surat - Bardoli Road at Aai Mata junction for BRTS under JuNURM Scheme, Surat. |
|
Client : |
Surat Municipal Corporation, Surat. |
|
Cost of Work : |
Rs.326 Millions. |
|
Year of Completion : |
January 2011 |
|
|
Description of Work : |
Foundation : |
1200 mm dia piles |
Substructure : |
RCC Pier and Pier Cap |
Superstructure : |
2 x 45 m PSC Box + 18 x 20 m PSC I Girder (Pretensioned) |
Approaches : |
R.E.structure. |
|
|
|
|
|
 |
 |
|
Conventional Routine Load Test on Pile
|
Pier and Pier Cap |
|
 |
 |
|
Casting of Precast Pretensioned I Girder at casting yard |
Prestressing of Precast I Girder at casting yard |
|
|
 |
 |
|
Lifting and launching of Precast Pretensioned I Girder in position using two Crawler Cranes |
|
|
 |
 |
|
|
Casting of PSC Box Girder |
Erection of RE Panel |
|
|
|
|
|
|
Remarks
: |
- The foundation of RCC bored piles (about 20 m long) were executed using MAIT HR 180 Hydraulic Rig. 144 nos. of Pretensioned Precast I Girders were cast in casting bed and launched them in position with the help of Crane. The 45 m box girders were cast in situ.
|
|