BRIDGES & FLYOVERS
Name of Work : Construction of Flyover Bridge on Surat Hazira main road near Star Bazar Junction, Surat.
 
Client : Surat Municipal Corporation, Surat.
 
Cost of Work : Rs.277.8 Million.
 
Year of Completion : April, 2014
 
Description of Work :

Foundation :

112 nos. of 1000 mm dia piles with average 28 metre depth.
280 nos. of 600 mm dia piles with average 9 metre depth for Retaining Wall.

Substructure :

RCC pier and pier cap

Superstructure :

8 x 25 m + 3 x 22.5 m PSC voided slab

Approaches :

Retaining walls on 600 mm dia piles

 
 
 
 
 
   
 
 
Remarks :
  • 75 metre span of bridge is supported on 9 prestressed cables of 100 mm nominal diameter.
  • The bridge has 30 m high RCC pylon above deck level (size of pylon varying from 12 x 1.5 m to 3 x 1.5 m) to anchor prestressing cables.