INFRA STRUCTURE PROJECTS ON BOT/BOLT/BOOT BASIS
BOT Projects  
Name of Work : Design & Construction of two lane bridge across river Mahi its approaches near Vasad from km 91/5 to 93/0 and its merging in A’bad-Baroda sections of NH No. 8 (Under BOT Scheme) (in JV).
 
Client : National Highway Circle, Vadodara. Government of Gujarat
 
Cost of Work : Rs. 420.00 Millions
 
Year of Completion : April 2000
 
Description of Work : Design and construction of high level bridge (1500 Meters including approaches) under BOT Scheme ( In J.V with Rajkamal Builders ) was consisting of :

Foundation : Well foundation ( 7 m dia. ) 35 m deep

Substructure :
RCC circular Pier ( 3 m dia)

Superstructure : PSC girders ( 16 x 33.53 + 2 x 14.26 m) and RCC deck slab

Approaches : Earthen Bank and Road
 
 
Design & Construction of two lane bridge across river Mahi its approaches near Vasad from km 91/5 to 93/0 and its merging in A’bad-Baroda sections of NH No. 8 (Under BOT Scheme)
 
Design & Construction of two lane bridge across river Mahi its approaches near Vasad from km 91/5 to 93/0 and its merging in A’bad-Baroda sections of NH No. 8 (Under BOT Scheme)
     
Road work in action
 
Road work in action
     
Design & Construction of two lane bridge across river Mahi its approaches near Vasad from km 91/5 to 93/0 and its merging in A’bad-Baroda sections of NH No. 8 (Under BOT Scheme)
 
Design & Construction of two lane bridge across river Mahi its approaches near Vasad from km 91/5 to 93/0 and its merging in A’bad-Baroda sections of NH No. 8 (Under BOT Scheme)
     
View of a Bridge across river Mahi on B.O.T.
 
View of a Toll Plaza Equipped with 5 Booths and 4 Lanes in each directions.
     
Design & Construction of two lane bridge across river Mahi its approaches near Vasad from km 91/5 to 93/0 and its merging in A’bad-Baroda sections of NH No. 8 (Under BOT Scheme)
 
Design & Construction of two lane bridge across river Mahi its approaches near Vasad from km 91/5 to 93/0 and its merging in A’bad-Baroda sections of NH No. 8 (Under BOT Scheme)
     
The Project Entrepreneur VIJAY MISTRY CONSTRUCTION AND RAJKAMAL BUILDERS PVT. LTD.
 
Mahi B.O.T. Project
     
Design & Construction of two lane bridge across river Mahi its approaches near Vasad from km 91/5 to 93/0 and its merging in A’bad-Baroda sections of NH No. 8 (Under BOT Scheme)
 
Design & Construction of two lane bridge across river Mahi its approaches near Vasad from km 91/5 to 93/0 and its merging in A’bad-Baroda sections of NH No. 8 (Under BOT Scheme)
     
Well Foundations ( 7 meter dia., 35 meter deep ) in action
 
Super structure ( PSC GIRDERS ) in action
 
 
Remarks :
  • Design and planning of the bridge meticulously done as per M.O.S.T standard and got approved in a short period of 2 months, 14 nos. of well foundations were completed in a period of 6 ½ months time during that lot of artisan conditions were found. To achieve the planned fast track schedules numbers of resources were mobilised such as 8 nos. of mobile crane were deployed for various activities of material handling, well sinking, sophisticated staging and shuttering of materials, all requires construction materials were arranged timely to match the planned productivity at site.

  • PSC and RCC work of substructure and superstructure were carried out with in housely developed shuttering and staging. Prefabricated RCC slab panels were used as shuttering for casting , deck slabs to get superior finish and save time of construction.

  • All precautions and measures have been taken to ensure quality control as per M.O.S.T standards and specifications.

  • It is planned to put toll plaza with required lan configuration along with latest sophisticated computerized toll collection system for better convenience of users. (Work has been completed in a period of 15 months against allotted time period of 24 months.)