INFRA STRUCTURE PROJECTS ON BOT/BOLT/BOOT BASIS
BOT Projects  
 
Name of Work : Design & Construction of ROB in lieu of L.C.No. 179 - C on Bharuch Dahej state highway on Build Operate and Transfer basis.
 
Client : Superintending Engineer Vadodara (R&B) Circle, VADODARA
 
Cost of Work : Rs. 55 Millions
 
Year of Completion : February 1999
 
Description of Work : Design and construction of Road over Bridge (1000 Meters including approaches) under BOT Scheme was consisting of :

Foundation : Pile Foundation and Open Foundation

Substructure :
RCC Circular Pier

Superstructure : PSC Girders ( 2 x 22 m) and RCC Spans (2 x 27 m)

Approaches : 1 Km. Approach of Earthen Bank
 
 
Design & Construction of ROB in lieu of L.C.No. 179 - C on Bharuch Dahej state highway on Build Operate and Transfer basis.
Design & Construction of ROB in lieu of L.C.No. 179 - C on Bharuch Dahej state highway on Build Operate and Transfer basis.
 
 
Approach Road towards Dahej Side
Road Over Bridge connecting Bharuch & Dahej State Highway
 
 
Design & Construction of ROB in lieu of L.C.No. 179 - C on Bharuch Dahej state highway on Build Operate and Transfer basis.
Design & Construction of ROB in lieu of L.C.No. 179 - C on Bharuch Dahej state highway on Build Operate and Transfer basis.
 
 
Road Over Bridge across Ahmedabad – Mumbai Main Line of Western Railway
Another View of ROB on BOT Basis
 
 
Remarks :
  • The prestigious first project of Government of Gujarat was completed in a record time of 13 months against allotted times of 22 months.

  • The intricate bridge work over electrified track (Ahmedabad – Mumbai line) was completed with minimum interference to on going Rail traffic.

  • Strict quality assurance and quality control parameters were used during bridge work, earth work and road work of this BOT project.

  • The riding quality of the bridge was appreciated by road users and saving in time