Name of Work : Construction of Negaria High Level Bridge at Deoli, Distt Tonk Rajasthan.
 
Client : Rajasthan State Road Devlopment & Construction Corporation Ltd.
 
Cost of Work : Rs.479.9 Million.
 
Year of Completion : Work in Progress
 
Description of Work :

Foundation :

1200 mm dia pile foundation. Total 2592 RM.

Substructure :

RCC Pier and Pier Cap

Superstructure :

19 x 37.20 m PSC I Girder with RCC Decks Slab.

Approaches :

RCC retaining walls on 600 mm dia piles

 
 
 
 
Remarks :
  • Kekri Deoli Road ODR-18 (Old SH 26) in District Tonk (Rajasthan) passes through the catchment of Banas river Dam. There is an existing bridge on this road, which remains submerged in water during rainy season for about 6 months in a year. As such the traffic has to take a detour of about 40 kms. to travel between Kekri and Deoli.

  • The new bridge with approaches are being constructed with sufficient verticle clearance against HFL, so that it remains motorable through out of the year.