Name of Work : Construction of Bridge across River Mahi Nr. Vasad on NH-8 in the state of Gujarat
 
Client : Modern Road Makers Pvt. Ltd., Mumbai
 
Cost of Work :
 
Year of Completion :
 
Description of Work :

Foundation :1200 mm dia bored cast in situ pile. Approx Maximum depth of pile was 39 rmt

Substructure :RCC Pier and pier cap

Superstructure : RCC & PSC "I" Beam with RCC Deck Slab Span - (33.5 m X 19 PSC) & (13.5 m X 2 RCC)

Approached : Earthen Embankment

Length of bridge :663 rmt

 
 
 
Front and Side View of Bridge (Height of Bridge about 30 meters)
 
 
Remarks :
  • 1200 mm dia RCC bored piles were constructed to a maximum depth of approx. 39 metre by Hydraulic Rig.

  • The height of the deck of the bridge is about 34 mtr from the deepest river bed level.

  • Superstructure – PSC I Girder of 33.5 mtr span (weighing 120 MT each) were cast on one of the approaches in casting yard. The girder were launched span by span using 70 mtr long (Weighting 95 MT) Structural steel launching truss. The handling and launching 250 MT PSC I Girder (Total 114 Nos.) was most challanging job.