BRIDGES & FLYOVERS
Name of Work : Construction of two lane elevated structure on LHS near Marvante Village on NH 17 in the state of Karnataka.
 
Client : Modern Road Makers Pvt. Ltd., Mumbai
 
Cost of Work : Rs.138.1 Millions
 
Year of Completion : Feb, 2017
 
Description of Work :

Foundation : 1200 mm dia bored cast in situ pile. Maximum depth of pile was 30. m

Substructure : RCC Wall type pier

Superstructure : RCC T Girder 17 m span

Approached :

Length of bridge : 494 m

 
 
 
 
 
 
 
 
Remarks :
  • 1200 mm dia RCC bored piles were constructed to a maximum depth of approx. 30 metre by Hydraulic Rig.

  • Superstructure – RCC T Girder of 17m spans approx. were concreted in Casting yard and Then RCC Girder Loaded by Crane on Trailer and transported to the location. The girders were lifted and erected on bearing with Heavy duty cranes. Casting of span required meticulous planning, accuracy and safety. Vijay M. Mistry Construction Pvt. Ltd. handled this most difficult and important activity of superstructure with great skill and safety.