Name of Work : Construction of parallel bridge to the existing Diu Ghoghla Bridge across sea creek at Diu.
 
Client : O.I.D.C Ltd., Daman
 
Cost of Work : Rs.358.7 Millions
 
Year of Completion : July-2015
 
Description of Work :

Foundation :1200 mm dia RCC bored piles. The depth of the pile was 33 mtr.

Substructure :RCC Pier Cap

Superstructure : PSC I Girder & RCC

Approached : a) Ghoghla Side: 75.38 m

Length of bridge :b) Diu Side: 136.75 m

 
 
 
Front and Side View of Bridge (Height of Bridge about 30 meters)
 
 
Remarks :
  • The bridge falls under tidal effect of sea. The 1200 dia mm pile were constructed using Hydraulic Rig, mounted on spud pontoon. The PSC girder were cast on temporary steel trusses providing between piers. The job was completed before schedule with fine tuning of all activities.