Name of Work
: |
Construction of Flyover Bridge on Surat Hazira main road near Star Bazar Junction, Surat. |
|
Client : |
Surat Municipal Corporation, Surat. |
|
Cost of Work : |
Rs.277.8 Million. |
|
Year of Completion : |
April, 2014 |
|
|
Description of Work : |
Foundation : |
112 nos. of 1000 mm dia piles with average 28 metre depth.
280 nos. of 600 mm dia piles with average 9 metre depth for Retaining Wall. |
Substructure : |
RCC pier and pier cap |
Superstructure : |
8 x 25 m + 3 x 22.5 m PSC voided slab |
Approaches : |
Retaining walls on 600 mm dia piles |
|